PPP's Unique Complete Polysilicon Plant Solution

For those seeking to build a new polysilicon plant, PPP Equipment Corporation (PPP-E) and Poly Plant Project (PPP) together offer initial consulting, investor services, a complete plant design, critical equipment, construction services, start up and training, and polysilicon product marketing.
PPP/PPP-E take this one step further by offering its unique-to-the-industry, Complete Plant Solution which integrates our modular packages and is customized for each plant and site (e.g. nameplate capacity and polysilicon purity specifications). PPP’s advanced, proven process technology and PPP-E’s equipment packages are customized for each project and plant site.
PPP/PPP-E's Complete Plant Solution includes the following services:
Initial Planning Services
- Feasibility study
- Capex and Opex estimates
- Funding applications support
- Environmental data report and risk analysis
- Plant site requirements, site evaluation
- Initial Plot Plan
- Infrastructure evaluation and recommendations
- Initial estimates for utilities
- Labor requirements
- Recruiting and staffing support
- Materials lists, specifications and sources
- Equipment lists, specifications and sources
- Emergency Response Plan support
- Process Technologies selection
- Project schedule estimate
- Selection of Engineering Procurement and Construction Company
- Polysilicon products sales and market support
- Safety recommendations
Plant Design
- Final Process Design
- Final Plot Plan
- Detailed Capex estimate
- Detailed Operating cost estimate
- Detailed Project Schedule
- Energy and Material Balance data
- Detailed data for utilities
- QA Laboratory design
- QC procedures
- Polysilicon Products specifications
Detailed Engineering Package & Procurement (Provided by PPP’s EPC Partner)
- Complete design of the Process Technology Areas
- Complete design of all Supporting Systems including:
- Feed Preparation
- Product Handling
- Process Vent and Emergency Vent Gas Treatment System
- Filament Production
- Waste Treatment Systems
- Steam Generation
- Utility Systems (Nitrogen, Hydrogen, Hydrochloric Acid, Process Water, Cooling Water, Refrigerants, etc.)
- Documents and Drawings in Addition to PTP ready for procurement of major equipment
- Preliminary 3-D Model of Plant with Piping greater than 50 mm.
- Complete facility design (Site, Building, Electrical, HVAC, etc.)
- Documents and drawings ready for construction
- Final 3-D model
- Detailed cost estimate
- Operating, Maintenance, Commissioning, and Analytical Manuals
- Procurement of all equipment
- All documents required by the construction company
Key Equipment
- TCS synthesis –Advanced Fluid Bed Reactor
- TCS purification
- Chemical Vapor Deposition Reactors
- Off-Gas Recovery & Recycling - Chlorosilane recovery package
- Cold Conversion (option)
- Advanced Thermal Converters
- Redistribution Columns
- Neutralization package for chlorosilane waste treatment
Project and Plant Construction Support
- Construction support
- Operator Training
- Safety Training
Plant & Equipment Commissioning, Start Up & Ramp Up
Plant Optimization
- Optimization to design capacity for all process areas